Archive for the ‘SREC Markets’ Category

IPA Files LTRRPP for ICC Approval

Posted December 19th, 2017 by SRECTrade.

On December 4th, the Illinois Power Agency (IPA) filed its Long-Term Renewable Resources Procurement Plan (LTRRPP or the Plan) for approval by the Illinois Commerce Commission (ICC). The Plan is part of the implementation of Public Act 99-0906 (the “Future Energy Jobs Act”), which took effect on June 1, 2017.

The initial ICC Filing, including the Filing Petition, Filed Plan and appendices, and the redline comparison of the draft Plan and the Filed Plan are available on the IPA’s website here.

In response to comments received on the draft Plan, the IPA made several changes to the Filed Plan, including changes to the following:

  1. REC Pricing Model – changes to the input data and structural assumptions in the CREST-based model used to create prices for the Adjustable Block Program (ABP)
  2. Collateral Requirements – reducing the required collateral percentage from 10% of contract value to 5% for the ABP
  3. Consumer Protection – includes adjustments to Approved Vendor requirements and the removal of duplicative or unnecessary requirements
  4. 10 – 25 kW System Size Adder – the addition of a new size category of 10 kW – 25 kW
  5. Initial Block Subscription Cap – reducing the minimum opening window for Block 1 from 60 days to 45 days; imposing a 200% capacity threshold; and proposing a lottery system for applications received after the budget is exceeded
  6. “Green Marketing” Challenges – adopting a proposal presented by several commenters to develop a “brand” for participation in the ABP and to develop content around that brand, explaining the value of participation
  7. Calculation of Load for MidAmerican – slight increase in MidAmerican’s RPS goals and budgets
  8. Single Approved Vendor Model – imposing a 100 kW minimum project size Single Approved Vendor category
  9. Allocation of Alternative Compliance Payment (“ACPs”) – proposing that the balance of payments made during the transition period be held in reserve for future years’ programs and procurements
  10. Voluntary Capacity Factors – allowing for Approved Vendors to submit a voluntary capacity factor based on PV Watts or an equivalent tool
  11. “Small Subscriber” Community Solar Participation
  12. Adjustable Block Program Group Organization – allocating the service territories of any rural electric cooperatives and municipal utilities within MISO to Group A, and any such territories within PJM to Group B, including moving MidAmerican to Group A
  13. Brownfield Site Procurement Volume
  14. Co-Location Restrictions for Developers

The IPA provided a summary of the above changes, and those proposals not accepted, in its Filing Petition.

In addition, the revised Block Group REC Price schedule is provided below (Table 6-2 of the Plan):

Block Group REC Prices ($/REC)

Objections were due on December 18, 2017 with responses to objections due on Thursday, January 11, 2018. Replies to responses will then be due on Thursday, January 25, 2018. The ICC is expected to issue its decision by April 3, 2018. The ICC docket for the plan is accessible here.

Visit our blog for previous and future posts about Illinois’ RPS and the Long Term Plan.

DOER Files Proposed Final APS Regulations

Posted December 19th, 2017 by SRECTrade.

On December 15th, the Department of Energy Resources (DOER) filed its proposed final version of the 225 CMR 16.00 Alternative Energy Portfolio Standard (APS) regulation with the Secretary of the Commonwealth’s Office. The official regulation is slated for publication in the State Registrar on December 29, 2017.

The filed version matches the version filed with the Joint Committee on Telecommunications, Utilities, and Energy on November 15, 2017. The final unofficial version of the regulation, as filed with the Secretary, is available here.

In addition to the regulations, the DOER provided the following final Guidelines, which will be effective on December 29, 2017:

  • Guideline on Metering and Calculations – Part 1 (Formulas for Small and Intermediate Generation Units)
  • Guideline on Metering and Calculations – Part 2 (Metering for Intermediate and Large Generation Units)
  • Guideline on Metering and Calculations for Fuel Cell Generation Units
  • Guideline on Biomass, Biogas, and Biofuels for Renewable Thermal Generation Units
  • Guideline on Multipliers for Renewable Thermal Generation Units
  • Massachusetts Alternative Energy Portfolio Standard Biomass Reporting Procedures
  • Guideline on Reduction of Greenhouse Gases for Eligible Renewable Thermal Generation Units Using Eligible Woody Biomass

These guidelines are available on the DOER’s website here.

The DOER expects to release its new online APS Statement of Qualification Application for Renewable Thermal and Fuel Cell Generation Units by mid-January. SRECTrade will provide more information to interested stakeholders as it is made available by the DOER. Please visit our blog for continued updates.

The DOER’s announcement can be viewed here.

New Jersey SREC Update – November 2017

Posted November 22nd, 2017 by SRECTrade.

With the announcement of new NJ solar build data last week, we wanted to provide an update on the current status of New Jersey SREC supply and demand. Since our last update in June 2017, build over the last 6 months (through September) has declined, pacing at 22.7 MW/month. That is approximately a 23.7% decrease against the last 12 month (LTM) rate of 29.8 MW/month. Additionally, the 3 months ending September 2017 saw a 45.5% decline in total build to 48.1 MW for the quarter, against 88.2 MW for the 3 months ending June 2017.

Electricity load served for reporting year 2017, ending May 2017, is estimated to be up 1.3% over RY2016 to 75.2 million megawatt hours. This is a shift in the flat to declining trend the market has experienced since reporting year 2012. Given current build and scenarios based off the 29.8 MW/month LTM rate, the NJ SREC market can expect an oversupply of approximately 500,000 SRECs during reporting year 2018 (approximately 20-25% over the estimated RY2018 requirement).

With regards to pricing, since the beginning of September pricing in the spot and forward markets have experienced appreciation. Pricing for NJ2018 and NJ2019 vintages has risen by approximately 12-14%, while pricing for NJ2020 and NJ2021 vintages has increased by approximately 30%. Price increases for the current vintages could be attributed to slightly lower than expected build rates and annual activity taking place ahead of the basic generation service (BGS) electricity auction, scheduled in early February 2018. Looking forward, price appreciation could also be due to early BGS activity, but also potentially attributed to the possibility of increased RPS requirements, particularly in light of the recent election of NJ Governor Phil Murphy and his stance on clean energy initiatives.

For a complete update on the supply and demand outlook, see our presentation here.

SRECTrade will continue to provide updates as available. Thank you and wishing everyone a Happy Thanksgiving!

DOER Announces SMART Program Administrator & 100 MW RFP // SREC-II Deadline on March 31, 2018

Posted November 14th, 2017 by SRECTrade.

On November 13, 2017 the Department of Energy Resources (DOER) announced that CLEAResult, Inc. will be the Solar Program Administrator for Massachusetts’s SMART Program.

The Distribution Companies have developed a request for proposals (RFP) for approximately 100 MW of solar projects in their respective utility service territories. The Distribution Companies will be hosting a bidder’s conference on Friday, November 17, 2017 at 1:00 PM EST to provide additional information and answer questions. Written comments on the RFP will be accepted through November 20, 2017 at 12:00 PM EST and should be submitted to ma.smart@clearesult.com. Bidders can submit an application on CLEAResult’s application website from November 27, 2017 – December 5, 2017 at 5:00 PM EST.  Results will be announced by the DOER by January 11, 2018. These results will establish the Block 1 Base Compensation Rates under the SMART Program.

The full announcement by the DOER can be found here.

As a reminder, systems must be mechanically complete or commercially operational by March 31, 2018 in order to participate in SREC-II under the current SREC Factors. Factors will be further reduced after this date but will remain at 0.8 for systems less than or equal to 25 kW.

Proposed Amendments to 310 CMR 7.75: Clean Energy Standard

Posted November 9th, 2017 by SRECTrade.

The Massachusetts Executive Office of Energy and Environmental Affairs (EEA) and the Massachusetts Department of Environmental Protection (MassDEP) have proposed amendments to 310 CMR 7.75: Clean Energy Standard. The amendments are intended to achieve greater consistency among all Executive Office of Energy and Environmental Affairs (EOEEA) clean energy programs and policies.

The amendments, a background document, and a notice with information about attending a November 27, 2017 public hearing in Boston at 10:00am and submitting written comments, are available on the Commonwealth of Massachusetts’s website here. Additional information about 310 CMR 7.75, including relevant stakeholder comments, is also available on their website.

The MassDEP published 310 CMR 7.75: Clean Energy Standard as a final regulation to reduce statewide greenhouse gas emissions. For more information on the promulgation of the MA Global Warming Solutions Act regulations, please visit our recent blog post on the topic here.

SRECTrade to Speak at GTM U.S. Power & Renewables Summit – November 8, 2017

Posted November 6th, 2017 by SRECTrade.

On Wednesday, November 8, SRECTrade’s Director of Regulatory Affairs, Allyson Browne, will be speaking on a panel at GTM’s U.S. Power & Renewables Summit in Austin, Texas.

Allyson will join moderator Colin Smith, Analyst, Solar at GTM Research and fellow panelists Terry Grant, Managing Director at Marathon Capital, and Peter Mathews, General Manager, North America at Solar Edge, to discuss solar cost trends and long-term market implications. Allyson will focus on the interplay between the cost per watt of solar (including the impact of possible tariffs resulting from the Section 201 trade case), federal tax incentives like the ITC, and solar renewable energy credit markets, and how these cost and revenue streams contribute to development (or lack thereof) in the residential and C&I sectors.

The panel, How Low Can They Go: What is Driving Down Solar Cost and What are Longer-Term Market Implications?, will be held at 11:20 am on Wednesday morning. See the full agenda here.

PA Passes Act Restricting Geographical Eligibility for PA SRECs

Posted October 30th, 2017 by SRECTrade.

On October 30th, Pennsylvania Governor Wolf signed into law Act No. 40 (see HB 118), a Comprehensive Opioid Package containing, among other items, language amending the state’s Alternative Energy Portfolio Standards (AEPS). Originating in February 2017, HB118 was revised several times before passage in the House and the Senate in late October.

Amendments to the AEPS require solar photovoltaic systems to satisfy one of the following in order to be eligible for participation in the AEPS solar carve-out (PA SREC) program:

“(I) DIRECTLY DELIVER THE ELECTRICITY IT GENERATES TO A RETAIL CUSTOMER OF AN ELECTRIC DISTRIBUTION COMPANY OR TO THE DISTRIBUTION SYSTEM OPERATED BY AN ELECTRIC DISTRIBUTION COMPANY OPERATING WITHIN THIS COMMONWEALTH AND CURRENTLY OBLIGATED TO MEET THE COMPLIANCE REQUIREMENTS CONTAINED UNDER THE “ALTERNATIVE ENERGY PORTFOLIO STANDARDS ACT.”

(II) BE DIRECTLY CONNECTED TO THE ELECTRIC SYSTEM OF AN ELECTRIC COOPERATIVE OR MUNICIPAL ELECTRIC SYSTEM OPERATING WITHIN THIS COMMONWEALTH.

(III) CONNECT DIRECTLY TO THE ELECTRIC TRANSMISSION SYSTEM AT A LOCATION THAT IS WITHIN THE SERVICE TERRITORY OF AN ELECTRIC DISTRIBUTION COMPANY OPERATING WITHIN THIS COMMONWEALTH.”

HB118 includes the following grandfathering language to protect certain systems already certified under the AEPS, but it is unclear how the Pennsylvania Public Utilities Commission (PUC) will interpret the language for certified but out-of-state generators.

(2) NOTHING UNDER THIS SECTION OR SECTION 4 OF THE “ALTERNATIVE ENERGY PORTFOLIO STANDARDS ACT” SHALL AFFECT ANY OF THE FOLLOWING:

(I) A CERTIFICATION ORIGINATING WITHIN THE GEOGRAPHICAL BOUNDARIES OF THIS COMMONWEALTH GRANTED PRIOR TO THE EFFECTIVE DATE OF THIS SECTION OF A SOLAR PHOTOVOLTAIC ENERGY GENERATOR AS A QUALIFYING ALTERNATIVE ENERGY SOURCE ELIGIBLE TO MEET THE SOLAR PHOTOVOLTAIC SHARE OF THIS COMMONWEALTH’S ALTERNATIVE ENERGY PORTFOLIO COMPLIANCE REQUIREMENTS UNDER THE “ALTERNATIVE ENERGY PORTFOLIO STANDARDS ACT.”

(II) CERTIFICATION OF A SOLAR PHOTOVOLTAIC SYSTEM WITH A BINDING WRITTEN CONTRACT FOR THE SALE AND PURCHASE OF ALTERNATIVE ENERGY CREDITS DERIVED FROM SOLAR PHOTOVOLTAIC ENERGY SOURCES ENTERED INTO PRIOR TO THE EFFECTIVE DATE OF THIS SECTION.

The revisions are effective as of the date of the Act (October 30, 2017). Accordingly, any new solar photovoltaic system seeking certification in the PA AEPS solar carve-out (SREC) program as of this date must meet the eligibility requirements above. The full text of the Act is available here.

SRECTrade will provide updates on the Act and on the PUC’s interpretation as soon as more information is made available.

Illinois Fall 2017 Utility DG Procurement Results

Posted October 20th, 2017 by SRECTrade.

In October 2017, SRECTrade participated in the Fall round of the Illinois 2017 Utility Distributed Generation Procurement. SRECTrade was among the three winning suppliers of the 5-year REC contracts awarded through the Fall 2017 Utility DG Procurement. A summary of average winning bid prices and number of RECs can be found below.  Please note that the number of RECs quoted by the IPA is in annual quantities. For the Illinois Power Agency’s official announcement of the results, please click here.

The IPA procured 40,765 RECs during the Fall round, which fulfilled 30% of the 2017 procurement target (138,510 total RECs over five years between both rounds). The remaining volume of 97,745 RECs was accounted for by the Spring round.

There are no future supplemental photovoltaic or distributed generation procurement rounds announced at this time. SRECTrade will be participating in the IL Adjustable Block Program, scheduled to roll out in mid-2018. For more information on this program, please visit our blog post on the topic.

DOER Files APS Regulations with Legislature

Posted October 16th, 2017 by SRECTrade.

On October 13, 2017, the Massachusetts Department of Energy Resources (DOER) filed an amended draft regulation with the Legislature’s Joint Committee on Telecommunications, Utilities and Energy. Pursuant to Chapter 251 of the Acts of 2014 and Chapter 188 of the Acts of 2016, the draft regulations add renewable thermal, fuel cells, and waste-to-energy thermal to the Massachusetts Alternative Portfolio Standard (APS). The filing follows two rounds of public hearing and comment periods occurring in the summers of 2016 and 2017. The draft regulation and accompanying guidelines are available on the DOER’s website here.

In response to stakeholder comments, the DOER made several revisions in the filed regulations. A brief summary of these changes is provided here, but the full redlined version is available for review here.

  • Woody Biomass: revised definitions and requirements, including fuel specification and performance requirements
  • Liquid Biofuels: reorganized quarterly caps to be distributed during each year and aligned requirements for Eligible Liquid Biofuels with the Environmental Protection Agency’s Renewable Fuel Standard (RFS)
  • Compost Heat Exchange Systems: added compost heat exchange systems as an eligible Renewable Thermal Generation Unit
  • Fuel Cells: revised efficiency threshold and modified eligibility for behind-the-meter, electric only, fuels cells to those interconnected to the Massachusetts electric grid
  • Multipliers for Non-Emitting Technologies: added multiplier for compost heat recovery systems and revised multipliers for intermediate and large, partial air source heat pump systems
  • Combination of Funding Provision: removed the combination of funding provisions and increased the maximum combination of funding percentage from DOER or any other state agency to 80%

In addition to the foregoing, the DOER made several technical edits and clarifications to reconcile language inconsistencies in the regulation and Guidelines. The DOER’s announcement of the filing is available here.

SRECTrade will continue to monitor the progress of the APS regulations and will provide updates as they are made available.

Illinois Power Agency Releases Draft Long-Term Renewable Resources Procurement Plan

Posted October 5th, 2017 by SRECTrade.

On September 29, 2017, the Illinois Power Agency (IPA) released its Draft Long-Term Renewable Resources Procurement Plan (the Draft Plan). The Draft Plan has been released for comment pursuant to Section 16- 111.5(b) of the Public Utilities Act and Sections 1-56 (b) and 1-75(c) of the Illinois Power Agency Act as recently modified by Public Act 99-0906, which went into effect on June 1, 2017.

The Draft Plan sets out the procurements and programs that the IPA has proposed in order to meet the Renewable Portfolio Standard (RPS) requirements contained in Section 1-75(c)(1) of the Illinois Power Agency Act, including the Adjustable Block Program and the Illinois Solar for All Program. This post provides a summary of the statutory process and a brief overview of the Adjustable Block Program (ABP) as presented in the Draft Plan, but does not contain detail on other elements of the plan, including competitive procurements, the Illinois Solar for All Program, or the Community Renewable Generation Program. For more details on these elements of the plan, please refer to the Draft Plan here.

Statutory Process

The IPA is accepting public comments on the Draft Plan for 45 days. Comments must be submitted to Mario Bohorquez, Planning and Procurement Bureau Chief, at mario.bohorquez@illinois.gov by November 13, 2017.

In addition to accepting public comments on the Draft Plan until November 13, 2017, the IPA will host three public hearings to accept in-person public comments. The dates and locations of these meetings are as follows:

  • Thursday, October 26, 2017, 3:00 pm – 4:30 pm CT: Illinois Commerce Commission Springfield Office, 527 East Capital Ave, Springfield, Illinois. Hearing Room C.
  • Tuesday, October 31, 2017, 10:00 am – 12:00 pm CT: Illinois Commerce Commission Chicago Office, 160 North LaSalle Street, Chicago, Illinois. Room N808.
  • Friday, November 3, 2017, 3:00 pm – 4:30 pm CT: MidAmerican Moline Customer Office, 716 17th Street, Moline, Illinois.

The IPA has 21 days following the end of the 45-day comment period to revise the Draft Plan and to file the Plan with the Illinois Commerce Commission (ICC). Based on the timeline presented by the IPA, April 3, 2018 is the deadline for the ICC to enter its order confirming or modifying the Plan. Please refer to the IPA Cover Letter and Hearing Notice for a full overview of the statutory deadlines and timeline.

Adjustable Block Program Overview

The Adjustable Block Program (ABP) features capacity-based blocks set at pre-determined prices for 15-year REC contracts. Key elements of the ABP model include the following, which are detailed in turn:

  1. Project Eligibility
  2. Program Administration & Application
  3. Block Structure & Transition between Blocks
  4. REC Target & Allocation
  5. Pricing
  6. Contract Payment Terms
  7. Performance Assurance & Delivery Requirements

Project Eligibility

There are two types of “new” projects that are eligible for the ABP. “New” is defined in the Draft Plan as “energized on or after June 1, 2017”.

The two project types are:

  1. Photovoltaic distributed renewable energy generation devices (i.e., DG solar); and
  2. Photovoltaic community renewable generation projects (i.e., community solar)

DG solar must be Illinois-sited and interconnected, behind-the-meter, and less than or equal to 2,000 kW AC. Refer to Section 2.5.1.1 of the Draft Plan for full project eligibility requirements.

Section 6.12.1 of the Draft Plan sets forth additional technical system requirements, including system documentation and metering requirements.

Program Administration & Application

The IPA will conduct an RFP for a Program Administrator to run the day-to-day operations of the Adjustable Block Program. The Program Administrator responsibilities will include program and contract management, application review and approval, providing program information for the public, and more.

Participation in the ABP “will take place through, and conditional upon, an Approved Vendor process” proposed by the IPA. Approved Vendors will be required to meet certain criteria and agree to certain terms set forth in the Draft Plan. The use of Approved Vendors will ensure program efficiency and protect Illinois consumers from “bad actors”.

Approved Vendors will submit projects bundled into batches of at least 100 kW and up to 2 MW. Once an Approved Vendor has successfully submitted five batches, the minimum size of a batch for that Approved Vendor will increase to 250 kW. However, the IPA sets forth special exemptions for minority-owned and female-owned businesses. For each project, there will be a non-refundable application fee of $10 per kW, not to exceed $5,000.

Once approved, each batch will result in one contract with one utility. That is, a batch of systems will be contracted with one utility on a portfolio basis. However, the price for the RECs for each system within a batch will be based on the price available within the applicable block on the date of the submittal (see sections below for more on blocks, categories, and pricing). In addition to the non-refundable application fee, there are collateral requirements. See below for information regarding contracting credit requirements.

Project Development Timeline and Extensions

It is not required that projects be energized or interconnected at the time of application. However, all projects will be subject to the following timelines and extensions (based on the contract execution date):

  • DG projects: one year to be developed and energized
  • Community solar projects: 18 months to be developed and energized and to demonstrate that they have sufficient subscribers

The IPA sets forth certain permissible extensions under Section 6.15.2.

Block Structure & Transition between Blocks

Each block will be for a specified quantity of nameplate capacity with a specific REC price. When a block reaches its subscription capacity, projects will be eligible for the next block and its block price.

For each Block 1 as summarized in the table below, all projects submitted within 60 days of the program opening date will be included in that Block 1, regardless of subscription to the block.

For subsequent blocks, each block will be held open for 14 days after the block is fully subscribed. The IPA will announce when a block has been filled and when the closing date will be.

REC Target & Allocation

The initial REC target for the ABP is to have 1,000,000 RECs delivered annually by the end of the 2020-2021 delivery year (i.e., May 31, 2021). Based on a blended 17% capacity factor, this amounts to roughly 666 MW of new photovoltaic generation. However, the IPA notes in its Draft Plan that this goal is not a cap and that, subject to demand and budget constraints, there is potential for additional capacity.

The blocks will be divided into two groups by service territory/geographic category and then further allocated by project category as follows:

Block Groups
  • Group A: for projects located in the service territories of Ameren Illinois, Mt. Carmel Public Utility, and rural electric cooperatives.
  • Group B: for projects located in the service territories of ComEd, MidAmerican, and municipal utilities.
Project Category Allocations

Section 1-75(c)(1)(K) of the Act requires a 25% each allocation for four categories:

  1. DG PV systems less than or equal to 10 kW (“Small systems”);
  2. DG PV systems greater than 10 kW and up to 2,000 kW (“Large systems”);
  3. PV community solar; and
  4. remainder to be allocated by the IPA.

Since it is too soon for the IPA to appropriately allocate the “remainder” category in any other manner, the IPA will distribute the 25% remainder amount evenly, for an allocation of 33.3% in each category 1-3. The IPA will revisit, review and reallocate the 25% remainder amount as needed in the Plan Update.

Accordingly, the 666 MW allocation is summarized by the IPA as follows:

Illustrative Block Opening Volumes (MW)

Capacity Factors

The IPA set a 16.4177% capacity factor for fixed-mount systems and a 19.3149% capacity factor for tracking systems. Accordingly, the estimated REC production would be as follows:

  • Fixed-Mount Systems: 21 RECs over 15 years per 1 kW AC
  • Tracking Systems: 25 RECs over 15 years per 1 kW AC

Pricing

The IPA adapted its REC Pricing Model from the CREST model developed by the National Renewable Energy Laboratory (NREL). The IPA modified the CREST model’s “input assumptions and post processing of the results.” IPA cautions in its Draft Plan that the prices summarized in the table below “should be viewed as preliminary in nature and not necessarily the prices that will be offered once programs launch, and parties should not take actions in reliance on the availability of these preliminary proposed incentive levels.” Parties can review, explore and comment on the data used, assumptions made, and the REC Pricing Model itself through the public comment process.

Block Group REC Prices ($/REC)

For systems in the Large DG PV and Community Solar categories, the IPA set a base price for each category at the >500 kW – 2,000 kW level with adders to differentiate the price for RECs from different sized systems, as summarized above. The IPA proposes these adders in lieu of sub-dividing project categories by project size or type. Adders are discussed in further detail in Section 6.5 (Tables 6-3 and 6-4) of the Draft Plan.

As shown in the table above, REC prices will step down by 4% in each block after Block 1. However, the IPA will monitor performance during the blocks and may modify the price step-down based upon the speed at which each block is filled.

Contract Payment Terms

For systems that are accepted into the ABP with an executed contract for 15 years of REC deliveries, payment will be made as follows:

  • Full Prepayment for DG systems of no more than 10 kW, paid “at the time that the facility producing the [RECs] is interconnected … and energized.”
  • 5-Year Payment Term for systems larger than 10 kW and community solar projects, with 20% paid at the time of interconnection and energization and the remaining portion “paid ratably over the subsequent 4-year period.”

The standard for “energized” as it applies to contract payment is the “completion of the interconnection approval by the local utility and the registration of the system in GATS or M-RETS so that generation data can be tracked and RECs created.”

Performance Assurance & Delivery Requirements

The Draft Plan sets forth certain credit and delivery requirements to manage performance over the life of the contracts. The Approved Vendor will be required to post collateral equivalent to 10% of the total contract value when each Batch’s contract is approved.

The collateral amount will be maintained for the life of the batch contract, but can be reduced in the later years of the contract when the collateral amount exceeds the remaining value of the contract. This requirement will be maintained at the portfolio level, not the individual system level, to manage the risk of systems that under-perform or have other issues, balanced against projects that over-perform. Under certain conditions, failure to deliver RECs will result in the utility drawing on the collateral to be compensated for undelivered RECs.

Next Steps

SRECTrade intends to participate in the continued statutory process set forth above, and plans to participate in the ABP as an Approved Vendor in a capacity similar to its role in the SPV and DG procurements.

The IPA issued an Errata on the Draft Plan on 10/06/17, which is available here. The Block Group REC Prices ($/REC) table in this post has been updated to reflect these corrected prices.