Posts Tagged ‘renewable portfolio standard’

Solar Capacity in the SREC States – April 2011

Posted May 4th, 2011 by SRECTrade.

SRECTrade SREC Markets Report: April 2011

The following post outlines the megawatts of solar capacity certified and/or registered to create SRECs in the SREC markets SRECTrade currently serves.

GATS_MA_Generators_April_2011_v1

PJM Eligible Systems

As of the end of April, there were 14,598 solar PV (14,344) and solar thermal (254) systems registered and eligible to create SRECs in the PJM Generation Attribute Tracking System (GATS) registry. Of these eligible systems, 52 (0.36%) have a nameplate capacity of 1 megawatt or greater, of which only 3 systems are greater than 5 MW. The largest system, currently located in Ohio, is 12 MW,  and the second largest, located in Chicago and eligible for the PA, DC, and MD markets, is 10 MW. The third largest system, located in NJ, is 5.6 MW.

Massachusetts DOER Qualified Projects

As of April 13, 2011, there were 524 MA DOER qualified solar projects; 467 operational and 57 not operational. Of these qualified systems, 11 (2.1%) have a nameplate capacity of 1 megawatt or greater, of which only 3 are between 1.5 and 2 MW. Three of the projects greater than 1 MW are currently operational.

Capacity Summary By State

The tables above demonstrate the capacity breakout by state. Note, that for all PJM GATS registered projects, each state includes all projects certified to sell into that state. State RPS programs that allow for systems sited in other states to participate have been broken up by systems sited in state and out of state. Additional detail has been provided to demonstrate the total capacity of systems only certified for one specific state market versus being certified for multiple state markets. For example, PA includes projects only certified to sell into the PA SREC market, broken out by in state and out of state systems, as well as projects that are also certified to sell into PA and Other State markets broken out by in state and out of state systems (i.e. OH, DC, MD, DE, NJ). PA Out of State includes systems sited in states with their own state SREC market (i.e. DE) as well as systems sited in states that have no SREC market (i.e. VA). Also, it is important to note that the Current Capacity represents the total megawatts eligible to produce and sell SRECs as of the noted date, while the Estimated Required Capacity – Current and Next Reporting Year represents the estimated number of MW that need to be online on average throughout the reporting period to meet the RPS requirement within each state. For example, New Jersey needs approximately 255 MW online for the entire 2011 reporting year to meet the RPS requirement. Additionally, the data presented above does not include projects that are in the pipeline or currently going through the registration process in each state program. This data represents specifically the projects that have been approved for the corresponding state SREC markets as of the dates noted.

Subscribe


Distributed Solar East Finance & Investment Summit (June 8-10, 2011)

Posted April 25th, 2011 by SRECTrade.

Given the relevance of SRECs in financing solar, SRECTrade has been involved with the Distributed Solar Finance & Investment Summit for the past few years and will be attending Distributed Solar East this summer in New Jersey. The event runs June 8th-10th, 2011 in Newark, NJ and is one of the best opportunities to network with a variety of stakeholders in the solar financing world.

For more information or to register, visit the event’s website.

DistSolar11_800x180

Solar Capacity in the SREC States – March 2011

Posted April 4th, 2011 by SRECTrade.

SRECTrade SREC Markets Report: March 2011

The following post outlines the megawatts of solar capacity certified and/or registered to create SRECs in the SREC markets SRECTrade currently serves.

Summary JPEG

PJM Eligible Systems

As of the end of March, there were 13,888 solar PV (13,634) and solar thermal (254) systems registered and eligible to create SRECs in the PJM Generation Attribute Tracking System (GATS) registry. Of these eligible systems, 46 (0.33%) have a nameplate capacity of 1 megawatt or greater, of which only 3 systems are greater than 5 MW. The largest system, currently located in Ohio, is 12 MW,  and the second largest, located in Chicago and eligible for the PA, DC, and MD markets, is 10 MW. The third largest system, located in NJ, is 5.6 MW.

Massachusetts DOER Qualified Projects

As of March 16, 2011, there were 337 MA DOER qualified solar projects; 314 operational and 23 not operational. Of these qualified systems, 11 (3.3%) have a nameplate capacity of 1 megawatt or greater, of which only 3 are between 1.5 and 2 MW. Two of the projects greater than 1 MW are currently operational.

Capacity Summary By State

The tables above demonstrate the capacity breakout by state. Note, that for all PJM GATS registered projects, each state includes all projects certified to sell into that state. State RPS programs that allow for systems sited in other states to participate have been broken up by systems sited in state and out of state. Additional detail has been provided to demonstrate the total capacity of systems only certified for one specific state market versus being certified for multiple state markets. For example, PA includes projects only certified to sell into the PA SREC market, broken out by in state and out of state systems, as well as projects that are also certified to sell into PA and Other State markets broken out by in state and out of state systems (i.e. OH, DC, MD, DE, NJ). PA Out of State includes systems sited in states with their own state SREC market (i.e. DE) as well as systems sited in states that have no SREC market (i.e. VA). Also, it is important to note that the Current Capacity represents the total megawatts eligible to produce and sell SRECs as of the noted date, while the Estimated Required Capacity – Current and Next Reporting Year represents the estimated number of MW that need to be online on average throughout the reporting period to meet the RPS requirement within each state. For example, New Jersey needs approximately 255 MW online for the entire 2011 reporting year to meet the RPS requirement. Additionally, the data presented above does not include projects that are in the pipeline or currently going through the registration process in each state program. This data represents specifically the projects that have been approved for the corresponding state SREC markets as of the dates noted.

Subscribe


Solar Capacity in the SREC States – February 2011

Posted March 2nd, 2011 by SRECTrade.

SRECTrade SREC Markets Report: February 2011

The following post outlines the megawatts of solar capacity certified and/or registered to create SRECs in the SREC markets SRECTrade currently serves.

Blog Table Image JPG more pixels

PJM Eligible Systems

As of the end of February, there were 12,995 solar PV (12,747) and solar thermal (248) systems registered and eligible to create SRECs in the PJM Generation Attribute Tracking System registry. Of these eligible systems, 43 (0.33%) have a nameplate capacity of 1 megawatt or greater, of which only 3 systems are greater than 5 MW. The largest system, currently located in Ohio, is 12 MW,  and the second largest, located in Chicago and eligible for the PA, DC, and MD markets, is 10 MW. The third largest system, located in NJ, is 5.6 MW.

Massachusetts DOER Qualified Projects

As of February 18, 2011, there were 220 MA DOER qualified solar projects; 204 operational and 16 not operational. Of these qualified systems, 10 (4.5%) have a nameplate capacity of 1 megawatt or greater, of which only 3 are between 1.5 and 2 MW. Only one of the projects greater than 1 MW is currently operational.

Capacity Summary By State

The tables above demonstrate the capacity breakout by state. Note, that for all PJM GATS registered projects, each state includes all projects certified to sell into that state. State RPS programs that allow for systems sited in other states to participate have been broken up by systems sited in state and out of state. Additional detail has been provided to demonstrate the total capacity of systems only certified for one specific state market versus being certified for multiple state markets. For example, PA includes projects only certified to sell into the PA SREC market, broken out by in state and out of state systems, as well as projects that are also certified to sell into PA and Other State markets broken out by in state and out of state systems (i.e. OH, DC, MD, DE, NJ). PA Out of State includes systems sited in states with their own state SREC market (i.e. DE) as well as systems sited in states that have no SREC market (i.e. VA). Also, it is important to note that the Current Capacity represents the total megawatts eligible to produce and sell SRECs as of the noted date, while the Estimated Required Capacity – Current and Next Reporting Year represents the estimated number of MW that need to be online on average throughout the reporting period to meet the RPS requirement within each state. For example, New Jersey needs approximately 255 MW online for the entire 2011 reporting year to meet the RPS requirement. Additionally, the data presented above does not include projects that are in the pipeline or currently going through the registration process in each state program. This data represents specifically the projects that have been approved for the corresponding state SREC markets as of the date noted.

Subscribe


Solar Capacity in the SREC States – December 2010

Posted January 5th, 2011 by SRECTrade.

SRECTrade SREC Markets Report: December 2010

The following post outlines the megawatts of solar capacity certified and/or registered to create SRECs in the SREC markets SRECTrade currently serves.

PJM Eligible Systems

As of the end of December, there were 11,241 solar PV (11,015) and solar thermal (226) systems registered and eligible to create SRECs in the PJM Generation Attribute Tracking System registry. Of these eligible systems, 35 (~0.3%) have a nameplate capacity of 1 megawatt or greater, of which only 3 systems are greater than 5 MW. The largest system, currently located in Ohio, is 12 MW,  and the second largest, located in Chicago and eligible for the PA and DC markets, is 10 MW. The third largest system, located in NJ, is 5.6 MW.

Massachusetts DOER Qualified Projects

As of December 10, 2010, there were 180 MA DOER qualified solar projects; 156 operational and 24 not operational. Of these qualified systems, 9 (~5.0%) have a nameplate capacity of 1 megawatt or greater, of which only 2 are between 1.5 and 2 MW. None of the projects greater than 1 MW are currently operational.

Capacity Summary By State

The tables below demonstrate the capacity breakout by state. Note, that for all PJM GATS registered projects, each state includes all projects certified to sell into that state. State RPS programs that allow for systems sited in other states to participate have been broken up by systems sited in state and out of state. For example, PA In State includes projects eligible to sell into the PA SREC market as well as projects that may also be eligible to sell into OH and DC. PA Out of State includes systems sited in states with their own state SREC market (i.e. DE) as well as systems sited in states that have no SREC market (i.e. VA). Also, it is important to note that the Current Capacity represents the total megawatts eligible to produce and sell SRECs as of the noted date, while the Estimated Required Capacity – Current and Next Reporting Year represents the estimated number of MW that need to be online on average throughout the reporting period to meet the RPS requirement within each state. For example, New Jersey needs approximately 255 MW online for the entire 2011 reporting year to meet the RPS requirement. Additionally, the data presented below does not include projects that are in the pipeline or currently going through the registration process in each state program. This data represents specifically the projects that have been approved for the corresponding state SREC markets to date.

Dec JPEG Image updated

Subscribe

California – State Senate Unable to Pass 33% Renewable Portfolio Standard Target

Posted September 2nd, 2010 by SRECTrade.

On August 31st, the California state senate was unable to vote on the country’s most aggressive renewable portfolio standard (RPS) program due to the session coming to at close at midnight. The bill, SB 722, which passed the state assembly, would have required California to produce 33% of its electricity from renewable sources by 2020.

Governor Schwarzenegger had made it clear he would not have signed the bill even if it passed the senate. The governor’s main concerns were that SB 722 did not allow for enough electricity to be imported from out of state. Additionally, the Governor wanted the bill to include a solution to streamline California’s siting and permitting process for renewable energy projects. Back in June, the Governor commented that he would not, “sign legislation mandating a higher requirement without ensuring that the necessary projects can be built.”

The two main arguments here have to do with developing a vibrant renewable energy market in the state of California while also maintaining competitive electricity pricing. Importing electricity from outside of California doesn’t help increase the number of in state jobs required to build the renewable energy projects needed to meet the 33% RPS target. On the other hand, allowing for greater amounts of electricity to come from out of state will increase competition and hopefully keep prices down, something to be mindful of considering the current economic environment in California.

While Governor Schwarzenegger signed an executive order to reach the 33% target, the order could be over turned by any future governor. Although SB 722 didn’t pass, the governor could call a special session of the legislature to pass the bill before the upcoming election. This could be the only chance for the ambitious 33% target as both California Governor candidate Meg Whitman and U.S. Senate candidate Carly Fiorina are opposed to it.

Subscribe

Maryland follows New Jersey and raises RPS levels

Posted May 17th, 2010 by SRECTrade.

Maryland Governor Martin O’Malley has said he will sign into law a new Renewable Portfolio Standard that increases the Alternative Compliance Payments (ACP) due if utilities don’t buy enough SRECs. Higher ACPs support higher SREC prices which in turn encourage more solar development.

While rebate programs have proven unreliable as state budgets are stained, SREC programs have proven to be a stable incentive for solar. New Jersey recently suspended their solar rebate program but has increased their ACP levels and the percentage of solar electricity required three times. Maryland is following suit, increasing the ACP to $400 through 2014 and slowing the pace that they lower ACP.

Compare the old and new Maryland RPS:

Year Solar RPS % Old ACP New ACP
2009 0.01% $400
2010 0.025% $400 $400
2011 0.05% $350 $400
2012 0.10% $350 $400
2013 0.20% $300 $400
2014 0.30% $300 $400
2015 0.40% $250 $350
2016 0.50% $250 $350
2017 0.55% $200 $200
2018 0.90% $200 $200
2019 1.20% $150 $150
2020 1.50% $150 $150
2021 1.85% $100 $100
2022 2.00% $100 $100
2023 2.00% $50