The PA Alternative Energy Program Administrators (AEPS) have changed the requirements for applying for SREC certification numbers. Any systems that apply for PA certification after 1/1/2012 must now provide the following:
Photos of the array- The photos must show theĀ entire array. Multiple photos should be provided if necessary.
Photos of the meter- The photos of the solar production meter or inverter (if no solar prooduction meter is installed) must show the kW-hr production at the time that the application is submitted. This meter reading will be the starting point for earning SRECs. For example, if the meter reads 500 kW-hrs at the time that the application is submitted then any future meter readings submitted will have 500 kW-hrs subtracted from them to determine SREC production.