Posts Tagged ‘Solar Renewable Energy Certificates’

Solar Capacity in the SREC States – April 2011

Posted May 4th, 2011 by SRECTrade.

SRECTrade SREC Markets Report: April 2011

The following post outlines the megawatts of solar capacity certified and/or registered to create SRECs in the SREC markets SRECTrade currently serves.

GATS_MA_Generators_April_2011_v1

PJM Eligible Systems

As of the end of April, there were 14,598 solar PV (14,344) and solar thermal (254) systems registered and eligible to create SRECs in the PJM Generation Attribute Tracking System (GATS) registry. Of these eligible systems, 52 (0.36%) have a nameplate capacity of 1 megawatt or greater, of which only 3 systems are greater than 5 MW. The largest system, currently located in Ohio, is 12 MW,  and the second largest, located in Chicago and eligible for the PA, DC, and MD markets, is 10 MW. The third largest system, located in NJ, is 5.6 MW.

Massachusetts DOER Qualified Projects

As of April 13, 2011, there were 524 MA DOER qualified solar projects; 467 operational and 57 not operational. Of these qualified systems, 11 (2.1%) have a nameplate capacity of 1 megawatt or greater, of which only 3 are between 1.5 and 2 MW. Three of the projects greater than 1 MW are currently operational.

Capacity Summary By State

The tables above demonstrate the capacity breakout by state. Note, that for all PJM GATS registered projects, each state includes all projects certified to sell into that state. State RPS programs that allow for systems sited in other states to participate have been broken up by systems sited in state and out of state. Additional detail has been provided to demonstrate the total capacity of systems only certified for one specific state market versus being certified for multiple state markets. For example, PA includes projects only certified to sell into the PA SREC market, broken out by in state and out of state systems, as well as projects that are also certified to sell into PA and Other State markets broken out by in state and out of state systems (i.e. OH, DC, MD, DE, NJ). PA Out of State includes systems sited in states with their own state SREC market (i.e. DE) as well as systems sited in states that have no SREC market (i.e. VA). Also, it is important to note that the Current Capacity represents the total megawatts eligible to produce and sell SRECs as of the noted date, while the Estimated Required Capacity – Current and Next Reporting Year represents the estimated number of MW that need to be online on average throughout the reporting period to meet the RPS requirement within each state. For example, New Jersey needs approximately 255 MW online for the entire 2011 reporting year to meet the RPS requirement. Additionally, the data presented above does not include projects that are in the pipeline or currently going through the registration process in each state program. This data represents specifically the projects that have been approved for the corresponding state SREC markets as of the dates noted.

Subscribe


Distributed Solar East Finance & Investment Summit (June 8-10, 2011)

Posted April 25th, 2011 by SRECTrade.

Given the relevance of SRECs in financing solar, SRECTrade has been involved with the Distributed Solar Finance & Investment Summit for the past few years and will be attending Distributed Solar East this summer in New Jersey. The event runs June 8th-10th, 2011 in Newark, NJ and is one of the best opportunities to network with a variety of stakeholders in the solar financing world.

For more information or to register, visit the event’s website.

DistSolar11_800x180

Solar Capacity in the SREC States – March 2011

Posted April 4th, 2011 by SRECTrade.

SRECTrade SREC Markets Report: March 2011

The following post outlines the megawatts of solar capacity certified and/or registered to create SRECs in the SREC markets SRECTrade currently serves.

Summary JPEG

PJM Eligible Systems

As of the end of March, there were 13,888 solar PV (13,634) and solar thermal (254) systems registered and eligible to create SRECs in the PJM Generation Attribute Tracking System (GATS) registry. Of these eligible systems, 46 (0.33%) have a nameplate capacity of 1 megawatt or greater, of which only 3 systems are greater than 5 MW. The largest system, currently located in Ohio, is 12 MW,  and the second largest, located in Chicago and eligible for the PA, DC, and MD markets, is 10 MW. The third largest system, located in NJ, is 5.6 MW.

Massachusetts DOER Qualified Projects

As of March 16, 2011, there were 337 MA DOER qualified solar projects; 314 operational and 23 not operational. Of these qualified systems, 11 (3.3%) have a nameplate capacity of 1 megawatt or greater, of which only 3 are between 1.5 and 2 MW. Two of the projects greater than 1 MW are currently operational.

Capacity Summary By State

The tables above demonstrate the capacity breakout by state. Note, that for all PJM GATS registered projects, each state includes all projects certified to sell into that state. State RPS programs that allow for systems sited in other states to participate have been broken up by systems sited in state and out of state. Additional detail has been provided to demonstrate the total capacity of systems only certified for one specific state market versus being certified for multiple state markets. For example, PA includes projects only certified to sell into the PA SREC market, broken out by in state and out of state systems, as well as projects that are also certified to sell into PA and Other State markets broken out by in state and out of state systems (i.e. OH, DC, MD, DE, NJ). PA Out of State includes systems sited in states with their own state SREC market (i.e. DE) as well as systems sited in states that have no SREC market (i.e. VA). Also, it is important to note that the Current Capacity represents the total megawatts eligible to produce and sell SRECs as of the noted date, while the Estimated Required Capacity – Current and Next Reporting Year represents the estimated number of MW that need to be online on average throughout the reporting period to meet the RPS requirement within each state. For example, New Jersey needs approximately 255 MW online for the entire 2011 reporting year to meet the RPS requirement. Additionally, the data presented above does not include projects that are in the pipeline or currently going through the registration process in each state program. This data represents specifically the projects that have been approved for the corresponding state SREC markets as of the dates noted.

Subscribe


Solar Capacity in the SREC States – February 2011

Posted March 2nd, 2011 by SRECTrade.

SRECTrade SREC Markets Report: February 2011

The following post outlines the megawatts of solar capacity certified and/or registered to create SRECs in the SREC markets SRECTrade currently serves.

Blog Table Image JPG more pixels

PJM Eligible Systems

As of the end of February, there were 12,995 solar PV (12,747) and solar thermal (248) systems registered and eligible to create SRECs in the PJM Generation Attribute Tracking System registry. Of these eligible systems, 43 (0.33%) have a nameplate capacity of 1 megawatt or greater, of which only 3 systems are greater than 5 MW. The largest system, currently located in Ohio, is 12 MW,  and the second largest, located in Chicago and eligible for the PA, DC, and MD markets, is 10 MW. The third largest system, located in NJ, is 5.6 MW.

Massachusetts DOER Qualified Projects

As of February 18, 2011, there were 220 MA DOER qualified solar projects; 204 operational and 16 not operational. Of these qualified systems, 10 (4.5%) have a nameplate capacity of 1 megawatt or greater, of which only 3 are between 1.5 and 2 MW. Only one of the projects greater than 1 MW is currently operational.

Capacity Summary By State

The tables above demonstrate the capacity breakout by state. Note, that for all PJM GATS registered projects, each state includes all projects certified to sell into that state. State RPS programs that allow for systems sited in other states to participate have been broken up by systems sited in state and out of state. Additional detail has been provided to demonstrate the total capacity of systems only certified for one specific state market versus being certified for multiple state markets. For example, PA includes projects only certified to sell into the PA SREC market, broken out by in state and out of state systems, as well as projects that are also certified to sell into PA and Other State markets broken out by in state and out of state systems (i.e. OH, DC, MD, DE, NJ). PA Out of State includes systems sited in states with their own state SREC market (i.e. DE) as well as systems sited in states that have no SREC market (i.e. VA). Also, it is important to note that the Current Capacity represents the total megawatts eligible to produce and sell SRECs as of the noted date, while the Estimated Required Capacity – Current and Next Reporting Year represents the estimated number of MW that need to be online on average throughout the reporting period to meet the RPS requirement within each state. For example, New Jersey needs approximately 255 MW online for the entire 2011 reporting year to meet the RPS requirement. Additionally, the data presented above does not include projects that are in the pipeline or currently going through the registration process in each state program. This data represents specifically the projects that have been approved for the corresponding state SREC markets as of the date noted.

Subscribe


Solar Capacity in the SREC States – December 2010

Posted January 5th, 2011 by SRECTrade.

SRECTrade SREC Markets Report: December 2010

The following post outlines the megawatts of solar capacity certified and/or registered to create SRECs in the SREC markets SRECTrade currently serves.

PJM Eligible Systems

As of the end of December, there were 11,241 solar PV (11,015) and solar thermal (226) systems registered and eligible to create SRECs in the PJM Generation Attribute Tracking System registry. Of these eligible systems, 35 (~0.3%) have a nameplate capacity of 1 megawatt or greater, of which only 3 systems are greater than 5 MW. The largest system, currently located in Ohio, is 12 MW,  and the second largest, located in Chicago and eligible for the PA and DC markets, is 10 MW. The third largest system, located in NJ, is 5.6 MW.

Massachusetts DOER Qualified Projects

As of December 10, 2010, there were 180 MA DOER qualified solar projects; 156 operational and 24 not operational. Of these qualified systems, 9 (~5.0%) have a nameplate capacity of 1 megawatt or greater, of which only 2 are between 1.5 and 2 MW. None of the projects greater than 1 MW are currently operational.

Capacity Summary By State

The tables below demonstrate the capacity breakout by state. Note, that for all PJM GATS registered projects, each state includes all projects certified to sell into that state. State RPS programs that allow for systems sited in other states to participate have been broken up by systems sited in state and out of state. For example, PA In State includes projects eligible to sell into the PA SREC market as well as projects that may also be eligible to sell into OH and DC. PA Out of State includes systems sited in states with their own state SREC market (i.e. DE) as well as systems sited in states that have no SREC market (i.e. VA). Also, it is important to note that the Current Capacity represents the total megawatts eligible to produce and sell SRECs as of the noted date, while the Estimated Required Capacity – Current and Next Reporting Year represents the estimated number of MW that need to be online on average throughout the reporting period to meet the RPS requirement within each state. For example, New Jersey needs approximately 255 MW online for the entire 2011 reporting year to meet the RPS requirement. Additionally, the data presented below does not include projects that are in the pipeline or currently going through the registration process in each state program. This data represents specifically the projects that have been approved for the corresponding state SREC markets to date.

Dec JPEG Image updated

Subscribe

New to Solar?

Posted February 15th, 2010 by SRECTrade.

We realize that many visitors of our site are learning about solar for the first time, so we thought we would put up this post by way of an introduction and some guidance on how to navigate our site. A growing number of states are implementing SREC programs. If you are new to solar, here is what you need to know:

1. Understand SRECs: For a deeper understanding of what SRECs are and how the programs work, visit our SREC Program page.

2. Find out where you are eligible to sell your SRECs: Your state may or may not have a program, however your ability to sell your SRECs into other states could have a significant impact on the value of your SRECs. You may be eligible to get your system certified in many state programs, regardless of if your state has one or not. Everyone should check our Cross-Listing post to see the states in which they may be eligible for certification.

3. Get your system installed: SRECTrade works with several installation companies. In addition, you should be able to sign up for the EasyREC service through your installer. If they do not offer the service, then feel free to contact us directly.

4. Enroll with SRECTrade: SRECTrade provides two options. If you sign up for the EasyREC service, we handle everything else including submitting your state certification applications, creating your SREC tracking account and automating the sale of your SRECs in our auction.

If you do not sign up for EasyREC, here are the additional steps:

4a. Get your system certified by your state: Once the system is installed, it is now ready to be certified by your state and any other states in which you are eligible. You can find out more on where you are eligible and how to apply on the Cross-Listing page. Every state handles this process differently, but we recommend beginning the application as soon as possible, before your installation is complete.

4b. Set up your SREC tracking account: Every state or region will use a different system for creating and tracking the SRECs. The Mid-Atlantic states use GATS, North Carolina uses NC-RETS, Massachusetts uses NE-GIS. If you opt to manage your own SRECs, you will need to have a tracking account with one of these registries. Once you have SRECs in that account, you can then post them in our auction.

4c. Create an account online with SRECTrade: This is the simplest step of all. Complete the online form to create your account and when your SRECs are available in your tracking account, log into your SRECTrade account, select the “Orders” link and place an offer to sell your SRECs.

5. Understand the timing: After you initially sign up, it will take a few months before you begin receiving payments. For example, if your system goes online on January 1st, your January generation will be recorded on February 1st. Your first SREC(s) will be actually credited to your account on March 1st. They would then be sold in the March auction, so your first payment would come in late March. After that, payments will come as SRECs are generated. Also note: some systems operate on a quarterly basis, rather than monthly.

As these processes are refined, we will continue to update this post. Please feel free to contact us any time at 877-466-4606 if you have any questions.